Marabou’s project portfolio reflects more than two decades of experience developing, owning, operating, and managing energy infrastructure. From producer connections and pipeline laterals to large industrial loads, power generation, data centers, and other emerging energy-intensive applications, our work continues to expand in both scale and diversity.

Each project is different, but the objective remains consistent: create practical, reliable energy solutions that connect supply with demand and support the long-term success of the customer. Marabou brings together infrastructure development, commodity supply, transportation, commercial management, and operations to address the specific requirements of each project.

Our history demonstrates a long-standing ability to move projects from concept through execution and into reliable operation. Today, that experience is being applied to a broader and growing range of opportunities as energy demand, infrastructure requirements, and market needs continue to evolve.

Built on experience. Growing with opportunity.

Highlighted Project

Coated steel pipe being lowered into an open trench by a sideboom

Wagon Train System.

Project type
Lateral to relieve system congestion
Customer type
Flow gas - circumventing constraints to new and existing/emerging markets
Challenge
Engineering for significant volumes to deliver along a challenging ROW consisting of highway crossings and mostly hard rock subsurface.
Marabou solution
A 10.5 mile delivery system with a 16-inch diameter. Development was executed in a four-month time frame after contracting, right of way, engineering and procurement. Services and installations: pipeline lateral and interconnects, gas transportation and commodity supply to downstream markets.
Outcome
Spread economics realized and significant volume upgrades from the producing to the delivery regions and the emerging infrastructure developments
Services used
  • Last-Mile & Lateral Pipeline Infrastructure
  • Natural Gas Supply & Transportation
County
Nolan County, Texas
Miles
10.5
Date completed
July 2026

Notable Projects

Aerial map of the delivery system's route through Bexar County, Texas, with the pipeline alignment traced in red.

Bexar System.

Project type
Delivery system
Customer type
Frac-sand facility using natural gas for large sand dryers
Challenge
A frac-sand facility near Elmendorf, Texas, using natural gas for large sand dryers. Right-of-way over private land, with three highway crossings and one railroad crossing.
Marabou solution
A 13.27-mile delivery system with a 6.625-inch outside diameter. Development was executed within six months after contracting, right-of-way, engineering and procurement.
Outcome
Economic and logistics uplift for the facility.
Services used
  • Last-Mile & Lateral Pipeline Infrastructure
County
Bexar County, Texas
Miles
13.27
Date completed
August 2018

Recent & Current

Aerial map of the delivery system's route through Montgomery County, Texas, with the pipeline alignment traced in red.

Natural gas delivery system.

Project type
Delivery system
Customer type
LNG production facility
Challenge
A Texas based LNG production facility. Strong regional LNG demand created the need for the facility. Right-of-way mainly over private land.
Marabou solution
A 1.64-mile delivery system with a 6.625-inch outside diameter. Development was executed within five months after contracting, right-of-way, engineering and procurement.
Outcome
Economic, logistics and competitive uplift from pipeline gas.
Services used
  • Last-Mile & Lateral Pipeline Infrastructure
County
Montgomery County, Texas
Miles
1.64
Date completed
November 2024

System List

Other Marabou Projects

Active Projects

Active projects
TypeStatusCountyDate CompletedDescription
transmissionactiveBrazosJul-12Gas Supply to Asphalt Plant
transmissionactivePolkAug-13Gas Supply to Asphalt Plant
transmissionactiveChildressOct-26Gas Supply to a State Prison
lateralactiveScurryMay-26Pipeline Interconnect Lateral
transmissionactiveMontgomeryNov-24GasSupply to LNG facility
transmissionactiveParker / HoodJul-17Gas Supply to Frac Sand Plant
transmissionactiveWinklerNov-17Gas Supply to Frac Sand Plant
transmissionactiveBexarOct-18Gas Supply to Frac Sand Plant
transmissionactiveBexarOct-24Gas Supply to Frac Sand Plant
transmissionactiveHoodJul-18Gas Supply for Equipment Testing
transmissionactiveHoodSep-21Gas Supply for Equipment Testing
transmissionactiveHoodJul-14Gas Supply to Frac Sand Plant

Past Projects

Past projects
TypeStatusCountyDate CompletedDescription
transmissioninactiveRobertsonDec-10Gas Supply to Frac Sand Plant
transmissioninactiveTrempealeauMay-15Gas Supply to Frac Sand Plant
transmissioninactiveBarronJul-11Gas Supply to Frac Sand Plant
transmissioninactiveBarronDec-14Gas Supply to Frac Sand Plant
transmissioninactiveBarronDec-12Gas Supply to Frac Sand Plant