A Record of Execution

Marabou’s project portfolio reflects more than two decades of experience developing, owning, operating, and managing energy infrastructure. From producer connections and pipeline laterals to large industrial loads, power generation, data centers, and other emerging energy-intensive applications, our work continues to expand in both scale and diversity.

Each project is different, but the objective remains consistent: create practical, reliable energy solutions that connect supply with demand and support the long-term success of the customer. Marabou brings together infrastructure development, commodity supply, transportation, commercial management, and operations to address the specific requirements of each project.

Our history demonstrates a long-standing ability to move projects from concept through execution and into reliable operation. Today, that experience is being applied to a broader and growing range of opportunities as energy demand, infrastructure requirements, and market needs continue to evolve.

Built on experience. Growing with opportunity.

Highlighted Project

Coated steel pipe being lowered into an open trench by a sideboom

Wagon Train System.

Project type
Lateral to relieve system congestion
Customer type
Flow gas - circumventing constraints to new and existing/emerging markets
Challenge
Engineering for significant volumes to deliver along a challenging ROW consisting of highway crossings and mostly hard rock subsurface.
Marabou solution
A 16 inch, 10.5-mile natural gas pipeline including a compression station. Construction and commissioning were executed in a four-month time frame after contracting, right of way, engineering and procurement. Services and installations: pipeline lateral and interconnects, gas transportation and commodity supply to downstream markets.
Outcome
Spread economics realized and significant volume upgrades from the producing to the delivery regions and the emerging infrastructure developments
Services used
  • Last-Mile & Lateral Pipeline Infrastructure
  • Natural Gas Supply & Transportation
County
Nolan County, Texas
Miles
10.5
Date completed
July 2026

Notable Projects

Aerial map of the pipeline system's route through Bexar County, Texas, with the pipeline alignment traced in red.

Bexar System.

Project type
Pipeline system
Customer type
Frac-sand facilities using natural gas for large sand dryers
Challenge
Supplying three frac-sand facilities with natural gas for use in their large sand drying units. Right-of-way over private land, with three highway crossings and one railroad crossing.
Marabou solution
A 6 inch, 13.27-mile natural gas pipeline. Executed within six months after contracting, right-of-way, engineering and procurement.
Outcome
Economic and logistics uplift for the facilities.
Services used
  • Last-Mile & Lateral Pipeline Infrastructure
County
Bexar County, Texas
Miles
13.27
Date completed
August 2018

Recent & Current

Aerial map of the pipeline system's route through Montgomery County, Texas, with the pipeline alignment traced in red.

Natural Gas Pipeline System.

Project type
Pipeline system
Customer type
CNG production facility
Challenge
A Texas based CNG production facility. Strong regional CNG demand created the need for the facility. Right-of-way mainly over private land.
Marabou solution
A 6-inch, 1.64 mile natural gas pipeline. Construction and commissioning was executed within five months after contracting, right-of-way, engineering and procurement.
Outcome
Economic, logistics and competitive uplift from pipeline gas.
Services used
  • Last-Mile & Lateral Pipeline Infrastructure
County
Montgomery County, Texas
Miles
1.64
Date completed
November 2024

System List

Other Marabou Projects

Active Assets

Active assets
TypeStatusCounty/StateDate CompletedDescription
transmissionactiveBrazos, TXJul-12Gas Supply to Asphalt Plant
transmissionactivePolk, TXAug-13Gas Supply to Asphalt Plant
transmissionactiveChildress, TXOct-26Gas Supply to a State Prison
lateralactiveScurry, TXMay-26Pipeline Interconnect Lateral
transmissionactiveMontgomery, TXNov-24Gas Supply to CNG facility
transmissionactiveParker / Hood, TXJul-17Gas Supply to Frac Sand Plant
transmissionactiveWinkler, TXNov-17Gas Supply to Frac Sand Plant
transmissionactiveBexar, TXOct-18Gas Supply to Frac Sand Plant
transmissionactiveBexar, TXOct-24Gas Supply to Frac Sand Plant
transmissionactiveHood, TXJul-18Gas Supply for Equipment Testing
transmissionactiveHood, TXSep-21Gas Supply for Equipment Testing
transmissionactiveHood, TXJul-14Gas Supply to Frac Sand Plant

Past Projects

Past projects
TypeStatusCounty/StateDate CompletedDescription
transmissioninactiveRobertson, TXDec-10Gas Supply to Frac Sand Plant
transmissioninactiveTrempealeau, WIMay-15Gas Supply to Frac Sand Plant
transmissioninactiveBarron, WIJul-11Gas Supply to Frac Sand Plant
transmissioninactiveBarron, WIDec-14Gas Supply to Frac Sand Plant
transmissioninactiveBarron, WIDec-12Gas Supply to Frac Sand Plant