A Record of Execution
Marabou’s project portfolio reflects more than two decades of experience developing, owning, operating, and managing energy infrastructure. From producer connections and pipeline laterals to large industrial loads, power generation, data centers, and other emerging energy-intensive applications, our work continues to expand in both scale and diversity.
Each project is different, but the objective remains consistent: create practical, reliable energy solutions that connect supply with demand and support the long-term success of the customer. Marabou brings together infrastructure development, commodity supply, transportation, commercial management, and operations to address the specific requirements of each project.
Our history demonstrates a long-standing ability to move projects from concept through execution and into reliable operation. Today, that experience is being applied to a broader and growing range of opportunities as energy demand, infrastructure requirements, and market needs continue to evolve.
Built on experience. Growing with opportunity.
Highlighted Project

Wagon Train System.
- Project type
- Lateral to relieve system congestion
- Customer type
- Flow gas - circumventing constraints to new and existing/emerging markets
- Challenge
- Engineering for significant volumes to deliver along a challenging ROW consisting of highway crossings and mostly hard rock subsurface.
- Marabou solution
- A 10.5 mile delivery system with a 16-inch diameter. Development was executed in a four-month time frame after contracting, right of way, engineering and procurement. Services and installations: pipeline lateral and interconnects, gas transportation and commodity supply to downstream markets.
- Outcome
- Spread economics realized and significant volume upgrades from the producing to the delivery regions and the emerging infrastructure developments
- Services used
- Last-Mile & Lateral Pipeline Infrastructure
- Natural Gas Supply & Transportation
- County
- Nolan County, Texas
- Miles
- 10.5
- Date completed
- July 2026
Notable Projects

Bexar System.
- Project type
- Delivery system
- Customer type
- Frac-sand facility using natural gas for large sand dryers
- Challenge
- A frac-sand facility near Elmendorf, Texas, using natural gas for large sand dryers. Right-of-way over private land, with three highway crossings and one railroad crossing.
- Marabou solution
- A 13.27-mile delivery system with a 6.625-inch outside diameter. Development was executed within six months after contracting, right-of-way, engineering and procurement.
- Outcome
- Economic and logistics uplift for the facility.
- Services used
- Last-Mile & Lateral Pipeline Infrastructure
- County
- Bexar County, Texas
- Miles
- 13.27
- Date completed
- August 2018
Recent & Current

Natural gas delivery system.
- Project type
- Delivery system
- Customer type
- LNG production facility
- Challenge
- A Texas based LNG production facility. Strong regional LNG demand created the need for the facility. Right-of-way mainly over private land.
- Marabou solution
- A 1.64-mile delivery system with a 6.625-inch outside diameter. Development was executed within five months after contracting, right-of-way, engineering and procurement.
- Outcome
- Economic, logistics and competitive uplift from pipeline gas.
- Services used
- Last-Mile & Lateral Pipeline Infrastructure
- County
- Montgomery County, Texas
- Miles
- 1.64
- Date completed
- November 2024
System List
Other Marabou Projects
Active Projects
| Type | Status | County | Date Completed | Description |
|---|---|---|---|---|
| transmission | active | Brazos | Jul-12 | Gas Supply to Asphalt Plant |
| transmission | active | Polk | Aug-13 | Gas Supply to Asphalt Plant |
| transmission | active | Childress | Oct-26 | Gas Supply to a State Prison |
| lateral | active | Scurry | May-26 | Pipeline Interconnect Lateral |
| transmission | active | Montgomery | Nov-24 | GasSupply to LNG facility |
| transmission | active | Parker / Hood | Jul-17 | Gas Supply to Frac Sand Plant |
| transmission | active | Winkler | Nov-17 | Gas Supply to Frac Sand Plant |
| transmission | active | Bexar | Oct-18 | Gas Supply to Frac Sand Plant |
| transmission | active | Bexar | Oct-24 | Gas Supply to Frac Sand Plant |
| transmission | active | Hood | Jul-18 | Gas Supply for Equipment Testing |
| transmission | active | Hood | Sep-21 | Gas Supply for Equipment Testing |
| transmission | active | Hood | Jul-14 | Gas Supply to Frac Sand Plant |
Past Projects
| Type | Status | County | Date Completed | Description |
|---|---|---|---|---|
| transmission | inactive | Robertson | Dec-10 | Gas Supply to Frac Sand Plant |
| transmission | inactive | Trempealeau | May-15 | Gas Supply to Frac Sand Plant |
| transmission | inactive | Barron | Jul-11 | Gas Supply to Frac Sand Plant |
| transmission | inactive | Barron | Dec-14 | Gas Supply to Frac Sand Plant |
| transmission | inactive | Barron | Dec-12 | Gas Supply to Frac Sand Plant |