WEBVTT

NOTE
Captions for the Grupo Simsa video on /about (spec §27.5 ground 3, §90.4).
Text: Kareem's transcript, made by listening to the narration
(docs/content/grupo-simsa-video-transcript.md, USER-SUPPLIED). Numbers are set
as numerals; three misspellings are corrected (spec §90.5); otherwise verbatim,
with Kareem's confirmed wording ("in convenience stores", "liquefication plant"
for the Sonora plant, "La Laguna of Durango").
Timing: from the spoken audio, by offline speech recognition (faster-whisper
small.en) word timestamps aligned to that transcript. The opening follows
Kareem's review by ear (2026-10-03): no music cue before "Grupo Simsa", and the
music marked where it starts, right after it. Onsets are from the audio.
Three starts were corrected where a second model (base.en) exposed a timestamp
artifact in the first: LP gas, Industrial park, and Leon Guzman.
Placement: every cue sits at line:70%, above the video's burned-in lower
third (about 85-97% of the frame), which bottom-placed captions covered.

1
00:00:03.200 --> 00:00:04.500 line:70%
Grupo Simsa.

2
00:00:04.500 --> 00:00:06.900 line:70%
[Music]
Founded in 1967.

3
00:00:06.900 --> 00:00:10.440 line:70%
An industrial conglomerate,
ranked as a lead in the energy sector,

4
00:00:10.440 --> 00:00:16.960 line:70%
with a diversified approach, and a broad scope
in multiple key areas of the national economy.

5
00:00:16.960 --> 00:00:23.700 line:70%
Simsa group, in one of its branches, has a production
and commercialization of purified water and ice.

6
00:00:23.700 --> 00:00:29.000 line:70%
With more than 2,000 points of sales, including
500 sales points in convenience stores,

7
00:00:29.000 --> 00:00:32.580 line:70%
with a fleet of 85 delivery trucks,

8
00:00:32.580 --> 00:00:34.680 line:70%
four high fructose transfer centers,

9
00:00:34.680 --> 00:00:39.420 line:70%
located in Tultebec, Monterrey, Hermosillo,
and Torreón city

10
00:00:39.420 --> 00:00:42.760 line:70%
with 610 rail tank cars capacity,

11
00:00:42.760 --> 00:00:48.220 line:70%
and 960,000 tons annual capacity
in all of its plants.

12
00:00:48.220 --> 00:00:52.160 line:70%
Transloading terminal fuels located
in Gomez Palacio, Durango

13
00:00:52.160 --> 00:00:56.560 line:70%
with a capacity of 12,000 barrels
per day throughput.

14
00:00:56.560 --> 00:01:02.200 line:70%
Solar Park in Delicias, Chihuahua,
with a capacity of 20 megawatt peak.

15
00:01:02.200 --> 00:01:07.920 line:70%
Solar Park in Hermosillo, Sonora,
with a capacity of 33 megawatt peak.

16
00:01:07.920 --> 00:01:11.820 line:70%
Number one nationwide in transportation
of fuels and hazardous materials,

17
00:01:11.820 --> 00:01:17.940 line:70%
with a fleet of 750 trucks,
and more than 1,300 semitrailers.

18
00:01:17.940 --> 00:01:21.640 line:70%
Number three country-wide in petroleum
products retail and marketing,

19
00:01:21.640 --> 00:01:27.680 line:70%
with an operation in more than 400
service stations and industrial clients.

20
00:01:27.680 --> 00:01:30.640 line:70%
Convenience stores, with our own brand, One,

21
00:01:30.640 --> 00:01:35.740 line:70%
operating 75 stores nationwide,
with ten under construction.

22
00:01:35.740 --> 00:01:38.960 line:70%
Marine storage terminal fuels
in Tuxpan, Veracruz,

23
00:01:38.960 --> 00:01:43.060 line:70%
with capacity of 1,280 barrels per day.

24
00:01:43.060 --> 00:01:49.440 line:70%
Marine storage terminal fuels located
in Altamira, Tamaulipas in phase 1.

25
00:01:49.690 --> 00:01:53.190 line:70%
[Music]

26
00:01:53.240 --> 00:01:58.160 line:70%
Natural gas pipeline and compressor
in Zapotlanejo, Jalisco,

27
00:01:58.160 --> 00:02:03.060 line:70%
with a capacity of 550 million
cubic feet per day.

28
00:02:03.060 --> 00:02:08.140 line:70%
Storage terminal fuels located
in San Jose Iturbide, Guanajuato,

29
00:02:08.140 --> 00:02:12.920 line:70%
with a capacity of 932,000 barrels
per day in storage.

30
00:02:12.920 --> 00:02:18.100 line:70%
LP gas commercialization with
40 storage plants nationwide,

31
00:02:18.100 --> 00:02:22.460 line:70%
and 360 carburation stations
all over the country.

32
00:02:22.460 --> 00:02:25.600 line:70%
Natural gas liquefication plant
in Hermosillo, Sonora,

33
00:02:25.600 --> 00:02:29.880 line:70%
with a capacity of 150,000 gallons per day.

34
00:02:29.880 --> 00:02:35.280 line:70%
Natural gas transportation via pipeline of more
than 6.8 million gigajoules per month,

35
00:02:35.280 --> 00:02:41.240 line:70%
distributed along 1,457 miles
of pipeline nationwide.

36
00:02:41.240 --> 00:02:47.120 line:70%
Industrial park SIMSA located in La Laguna
of Durango, now under construction,

37
00:02:47.120 --> 00:02:51.500 line:70%
with an area of 17.3 million square feet.

38
00:02:51.500 --> 00:02:54.000 line:70%
Liquefied natural gas for vehicles,

39
00:02:54.000 --> 00:02:57.200 line:70%
with 24 stations under construction
countrywide.

40
00:02:57.200 --> 00:03:01.200 line:70%
Railway LP Gas terminal INTERSIM
in Torreon, Coahuila,

41
00:03:02.720 --> 00:03:06.880 line:70%
with a capacity of 50,000 tons of LPG per month.

42
00:03:09.500 --> 00:03:14.340 line:70%
Natural gas liquefaction plant,
located in Leon Guzman, Durango,

43
00:03:14.340 --> 00:03:18.340 line:70%
with a capacity of 150,000 gallons per day.

44
00:03:18.590 --> 00:03:25.750 line:70%
[Music]

45
00:03:25.800 --> 00:03:29.240 line:70%
Transloading terminal fuels,
in Guadalajara, Jalisco,

46
00:03:29.240 --> 00:03:33.720 line:70%
with a capacity of 15,000 barrels
per day throughput.

47
00:03:33.970 --> 00:03:42.420 line:70%
[Music]