This video was taken at the Superior Silica Sand facility in Wisconsin. Marabou Superior Pipeline LLC recently completed a six mile pipeline to the facility that mines, dries and ships by rail a maximum of 350 tons of frac sand per hour from a Hauck rotary dryer. The video shows the first days of production testing following the installation of our pipeline natural gas direct supply connection.
Marabou designed and built the pipeline, acquired all rights of way, federal (USF&W, Army Corps of Engineers, etc.) state, county and local approvals and permits, surface owner damages settlement, regulatory inspections and environmental permits. We also conduct all ongoing operations and maintenance inspections and required patrols.